Baltur BTL20 Burner SUPPORT GROUP(Spare Parts for Burner)

¥15.00

Description

Baltur BTL20 Burner SUPPORT GROUP(Spare Parts for Burner)

Remote or temporary camps, whether set up for disaster relief, exploration, or construction, face unique challenges in managing waste. Traditional waste disposal methods are often impractical or environmentally damaging. HiClover introduces a groundbreaking solution with the Mobile Incinerator for Remote Camps, designed to meet the specific needs of these isolated or temporary setups.

The Design Philosophy

  • Mobility: The hallmark of these incinerators is their ability to be transported easily. Whether Containerized or on a Trailer, they can follow camps as they move, ensuring waste management is always on-site.
  • Ease of Setup: With minimal infrastructure needed, these units can be operational in new locations swiftly, which is crucial for camps that might not stay in one place for long.
  • Fuel Versatility: Adaptable to use Diesel, Natural Gas, or LPG, these incinerators can function in areas far from conventional energy sources, making them ideal for remote locations in countries like Papua New Guinea or Indonesia.

Key Features for Remote Operations

  • PLC Automatic Control: This feature allows operation with limited personnel training, which is often the case in remote camps where specialized staff might not be available.
  • High Temperature Retention (HTR): Ensures complete combustion of waste, reducing volume significantly, which is vital when space for waste storage is scarce.
  • Compact Chamber Size: Ranging from 100 liters to 6000 liters, these incinerators can be sized according to the camp’s waste generation, fitting into tight or varying spaces.
  • Smoke Scrubber (Wet Scrubber): Critical for maintaining environmental standards, especially in sensitive ecosystems where remote camps might be located.

Real-World Deployment

  • In Disaster Relief Efforts: Following natural disasters like those in Haiti or Nepal, HiClover’s incinerators have provided essential waste management services, preventing outbreaks of diseases from unmanaged waste.
  • For Mining and Construction: In remote mining sites in Australia or construction camps in Africa, these units handle both general and hazardous waste, keeping operations clean and compliant.
  • Humanitarian and Peacekeeping Missions: In regions like South Sudan or East Timor, where UN and other NGOs operate, the mobility and efficiency of these incinerators support sustainable camp management.

Technical Advantages

  • Burning Rate: Capable of processing waste from 5kgs to 1000kgs per hour, the incinerator can adjust to the fluctuating waste production typical in remote camps.
  • Feeding Door Options: Whether Side, Front, or Top Feeding, the design can be adapted to the physical constraints of the camp’s layout.
  • Automatic Cooling and Protection: Features like Automatic Protection Operator (APO) ensure safety, crucial when operating in areas with limited medical facilities.

Why HiClover for Remote Camps?

  • Proven Reliability: HiClover has a track record of serving clients in some of the world’s most challenging environments, from the deserts of Oman to the jungles of Indonesia.
  • Customizable Solutions: Each incinerator can be tailored to the specific waste profile and operational needs of the camp, ensuring optimal performance.
  • Support and Accessibility: With contact options like +86-13813931455 or WhatsApp, HiClover ensures that support is just a message away, even from the most remote locations.

Conclusion

HiClover’s Mobile Incinerator for Remote Camps is not just a piece of equipment; it’s a strategic asset that enhances the sustainability and efficiency of operations in isolated areas. By integrating these incinerators, camps maintain cleanliness, protect local environments, and uphold operational standards without compromising mobility or setup speed.

For more insights or to discuss your specific requirements, visit www.hiclover.com:

Model YD30 Waste Incinerator 30-50 kg/hour, Model YD300 Incinerator 300-500 kg/hour, Model TS10 Incinerator with wet scrubber (Spray Tower) and Defogging Tower, Model YD50C Waste Incinerator, Pets Bone Crusher Processing Center with Vacuuming function,

Mobile: +86-13813931455(WhatsApp)

Baltur BTL20 Burner SUPPORT GROUP(Spare Parts for Burner)
Scroll to top